Cressi AC25M Master Cromo Regulator
The AC25M balanced-piston first stage uses a rotating turret to support different hose-routing arrangements. It connects to the pneumatically balanced Master Cromo second stage with a Cressi Safeflex LP hose.
- Choose DIN or yoke connection.
- Two HP ports and five LP ports, including a port at the turret end.
- Second-stage inhalation-effort and Venturi adjustments.
- Matte-finish coated-brass first stage.
This model is listed for water above 10°C. Select the correct connection for your cylinder valve and have regulator adjustments performed by a qualified service technician.







